Innovative Engineering
Stainless Piping Systems has a dedicated team of experienced professional engineers and CanBIM affiliated mechanical designers committed to the successful completion of every project, no matter the size. The engineering team is the first of three pillars that compose the backbone of our company, responsible for the interpretation of our customer needs and realization via design.
SPS engineers take pride in ensuring an open line of communication with all our clients and provide support and assistance from product conception, through to fabrication and on field installation. Our customers have come to expect exactly what we can deliver: Accuracy and cost-effective product delivery. Equipped with cutting edge graphic design software and project management tools, our engineering team will carry through the different stages of a project from start to finish ensuring efficient and timely problem solving to any project challenges.
True Prefabrication
Serving as the second pillar, the SPS manufacturing team has perfected the art of piping system fabrication over its thirty plus years of industry experience. Equipped with cutting edge equipment and a knowledgeable crew, the quality of workmanship we have provided to the pharmaceutical, as well as various other industries, has given us a reputation of being the best in the business. Capable of expanding to twice its size to accommodate large projects, the production floor consists of a skid fabrication shop, pipe fabrication shop, passivation shop as well as offsite warehousing availabilities.
Utilizing years of experience along with current and expanding computer aided techniques, our high degree of pre-fabrication ensures a consistent and high-quality product, delivered in the most cost-effective manner possible. At Stainless Piping Systems, we are dedicated to excellence. Our customers expect that and we expect it from ourselves. Our thorough and comprehensive attention to detail insures each and every job ends with a satisfied customer.
Efficient Installation
The third and final pillar is represented by our skilled field team, which is accomplished in executing high profile jobs in high profile applications. Accompanied by field engineers and the full support of the United Association Local 46 Union, we are capable of executing large construction jobs running 60+ personnel at on site locations.
Thanks to our “True Prefabrication” approach we bring the highest cost savings with fastest installation completion times in the industry. Stainless Piping Systems believes the timely execution of field installation is crucial to project success and client satisfaction.
To ensure this belief is always met, SPS will assemble up to 75% of a piping system in house, minimizing on field square footage required for installation and site shutdown time.